Explore
show opening times
- 08 October 2024
- 16:00 - 20:00
- 09 October 2024
- 10:00 - 20:00
- 10 October 2024
- 10:00 - 16:00
- FREE TO ATTEND
venue
- antwerp expo
- hall 4
- Jan van rijswijcklaan 191
- 2020, antwerpen
- belgium
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
Blue Water Shipping has transported the world’s largest wind turbine blades, with a length of up to 108 metres and a weight of 65.6 tonnes per blade.
The blades, for Siemens Gamesa’s 14 MW turbines, were loaded in Aalborg, and then shipped to Hanstholm onboard MV Symphony Provider/. Blue Water also managed the unloading upon arrival. The blades are to be used at Test Centre Østerild which is a testing site for offshore wind turbines onshore to make it easier to perform measurements, services and adjustments before the turbines are placed offshore.
Source: breakbulk.news
Sign up to the XL Anchor monthly newsletter to be the first to receive exclusive content and industry news.