Explore
show opening times
- 08 October 2024
- 16:00 - 20:00
- 09 October 2024
- 10:00 - 20:00
- 10 October 2024
- 10:00 - 16:00
- FREE TO ATTEND
venue
- antwerp expo
- hall 4
- Jan van rijswijcklaan 191
- 2020, antwerpen
- belgium
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
The transport and installation will start in 2023 and will be the first assignment for their NextGen offshore installation vessel Les Alizés.
Jan De Nul’s scope includes the transport and installation of 106 wind turbine monopile foundations and one offshore substation foundation, including associated topside. For the first time, Ørsted will be using monopiles without the need of installing a transition piece for connecting turbine and foundation. Before installation, scour protection will be installed at all 107 monopiles locations.
Once completed, these German wind farms will generate enough electricity to power approx. 1.2 million German households every year.
Source: Breakbulk.news
Sign up to the XL Anchor monthly newsletter to be the first to receive exclusive content and industry news.