Explore
show opening times
- 08 October 2024
- 16:00 - 20:00
- 09 October 2024
- 10:00 - 20:00
- 10 October 2024
- 10:00 - 16:00
- FREE TO ATTEND
venue
- antwerp expo
- hall 4
- Jan van rijswijcklaan 191
- 2020, antwerpen
- belgium
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
Sarens, a specialist in heavy lifting and engineered transport, finished the transportation and installation of two bridge sections for the Clyde Waterfront and Renfrew Riverside swing bridge project in Glasgow, Scotland.
This important new river crossing over the Clyde River is a collaborative effort between Smulders and Hollandia Infra. The bridge, designed with two wings, will link the north and south banks of the river, connecting Renfrew, Clydebank, and Yoker, approximately 8 km west of Glasgow city centre.
Read more: Project Cargo Journal
Sign up to the XL Anchor monthly newsletter to be the first to receive exclusive content and industry news.