Explore
show opening times
- 08 October 2024
- 16:00 - 20:00
- 09 October 2024
- 10:00 - 20:00
- 10 October 2024
- 10:00 - 16:00
- FREE TO ATTEND
venue
- antwerp expo
- hall 4
- Jan van rijswijcklaan 191
- 2020, antwerpen
- belgium
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
Allseas has been awarded a major decommissioning contract by TAQA UK for the removal and disposal of multiple Northern North Sea (NNS) facilities.
The engineering, preparation, removal, and disposal (EPRD) contract comprises TAQA’s Eider Alpha, Tern Alpha, North Cormorant and Cormorant Alpha platforms.
The combined weight of the topsides and jackets to be removed is around 114,000 tonnes, making this the largest single offshore UK Continental Shelf (UKCS) decommissioning contract scope to date.
Allseas’ task is to remove four platform topsides, three steel supporting jackets and transport to a suitable onshore yard facility for dismantling, with the aim of reusing or recycling 95 percent or more of the materials.
The platforms are located close to each other, approximately 100 km north-east of Shetland, in water depths ranging from 150 to 167 m.
All structures will be lifted and removed to shore as single units using Allseas’ heavy lift vessel Pioneering Spirit. Platform removals are planned post 2025.
Source: heavyliftpfi.com
Sign up to the XL Anchor monthly newsletter to be the first to receive exclusive content and industry news.