Explore
show opening times
- 08 October 2024
- 16:00 - 20:00
- 09 October 2024
- 10:00 - 20:00
- 10 October 2024
- 10:00 - 16:00
- FREE TO ATTEND
venue
- antwerp expo
- hall 4
- Jan van rijswijcklaan 191
- 2020, antwerpen
- belgium
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
Watch the trailer for AXL 2024 and subscribe to our YouTube channel.
Showcasing our past 2023 and 2024 AXL exhibitions.
Access the AXL 2024 trend report for exclusive insights, including vital figures and facts from our past event.
Navigate future trends with confidence.
Barrus Projects moved four reactors manufactured by PJSC “Izhorskiye Zavody” from Kolpino, St. Petersburg to Nizhnekamsk, Republic of Tatarstan for the installation of a hydrocracking unit.
The oversized cargo:
· First stage reactor pos. 4104R0101, 53.335 x 7.8 x 6.245 m / 1090.175 T
· Second stage reactor pos. 4104R0102, 33.844 x 7.1 x 5.096 m / 427.38 T
· Hydrodearomatisation reactor pos. 1503R0101 35.9 x 4.5 x 4.16 m / 236.14 T
· Dewaxing reactor pos. 1503R0102 20.7 x 4.5 x 4.06 m / 108.64 T
Barrus Projects had the task of providing services for the transportation of oversized heavy reactors from the manufacturing plant in Kolpino across two railway crossings PCh-10 and PCh-29, including the preparation of the necessary infrastructure for the possibility of passing in curves, transportation by inland waterways using a barge towing arrangement, as well as the delivery of reactors on self-propelled hydraulic modular trailers in Nizhnekamsk.
Source: breakbulk.news
Sign up to the XL Anchor monthly newsletter to be the first to receive exclusive content and industry news.